We will supply ideal providers and substantial top quality items with all sincerity. Full use has been produced of all types of advanced techniques and technologies to achieve excelsior production. specialize in power transmission merchandise, CATV goods, mechanical seal, hydraulic and Pheumatic, and marketing items.
Automobile-Change variety C to Z EPTT Purlin EPTT
for C80-three hundred amp Z120-300 profile
Profile Drawing
Pre-Punching
Principal EPTT
With feeding materials XiHu (West EPT) Dis.Hu (West EPT) Dis., physique body produced from H450 kind steel by welding
Side wall thickness: Q235 t30mm Tie rod: #109222 Galvanized
Rollers produced from Gcr15/Cr12 steel,CNC lathes,Heat Remedy,difficult Chrome Coated
with thickness .04mm,surface area with mirror therapy
The guarantee for the rollers is two years
Shafts Diameter= #109290 mm,precision EPTTd
EPT/EPT driving,about 21-action to type(19-action to kind and three phase for last shaping).
Main EPT=eighteen.5KW , Frequency speed manage
Velocity redcucer motor:K collection
Size shifting motor:6pcs, EPTTally managed by PLC Programing.
Sliding block:a hundred and fifty*150mm
All the screw bolts with grade 8.8
Genuine forming pace 20m/min (relying on the variety of punching holes)
With squareness roller setup
PLC EPTT Technique
EPTT The EPTtity And Cutting Length EPTTally
Input The Generation Knowledge(Manufacturing Batch,pcs,Size,and so forth.)On The Contact Monitor ,It Can End The Generation EPTTally.
Combined With: PLC, Inverter, Touch Screen, Encoder, and so on
PLC:EPT (German model)/Schneider(French model)
Inverter:EPT (German brand)/Schneider(French model)
seven-Inch EPTT Contact Display:EPT (German model)/Schneider(French brand name)
Encoder: Omron (Japan model)
Swap Base, Show EPT, EPTT EPT, Intermediate Relay, AC Contactor,
Thermal Relay: EPT(German brand)/Schneider(French brand)
Air Swap: LG-LS(Korea manufacturer)
Reduce-to-Size Tolerance le plusmn1 mm
EPTT Voltage 24V
SAMPLE Present
Following-Sale Services
one. The guarantee is 24 months following the client EPTs the EPTT.
In The 24months, we will courier the substitute elements to the shopper
cost-free of cost
2.We offer specialized support for the total daily life of our EPTTs
3. We can send out our professionals to put in and practice the personnel in the clients’ factories with added EPT
Conditions Of EPT
1.Minimal purchase amount (MOQ): one Set
two.Delivery time: about 45 workdays
three.Port of loading: port of HangEPT
four.Kind of payment: by T/T or by L/C
5.Export:to more than 60 nations and areas, incXiHu (West EPT) Dis.Hu (West EPT) Dis. EPTTiwan, United kingdom, France, Singapore,
Greece, Australia, Usa, MeXiHu (West EPT) Dis.co, Brazil, Chile, EPTTvia, Trinidad, Israel, Saudi Arabia, and so forth
EPTT Type
EPTT method: Main physique of EPTT is naked and coated by plastic film(to safeguard of dust and corrosion),
loaded into container and steadily mounted in container suitable by metal rope and lock, appropriate for EPTT-length transportation.
Making time: about 50 workdays right after EPTd the EPT payment
EPTT approach: with nude EPTT steadily fastened in a single 40 toes container appropriate for
EPTT-distance transportation
ABOUT US
Brand name FORMING EPTTRY EPTT,LTD(BMS)
HangEPT BMS EPT
EXHIBITION
Factory
Customer
Quality IS OUR Culture!
WITH US YOUR Income IN Risk-free,
YOUR BUINESS IN Protected!
IF U ARE Intrigued OUR EPTTS
Remember to Speak to WITH ME!